TCCON > Sites > Burgos

Burgos

 

To update your operational status, please use the Operational Status subpage form.

SiteUser NameOperational?DescriptionDate
BurgosmorinoYes2017-07-02

Latest News:

Burgos, Philippines

TCCON Status: Provisional

Site Lat, Lon: 18.5325°N, 120.6496°E 

Altitude: 35 m

Operational as of 2017-03-03

Operated by the National Institute for Environmental Studies (NIES), the University of Wollongong (UoW), the Energy Development Corporation (EDC), and supported in part by the GOSAT project.

Contributors: Voltaire A. Velazco, Isamu Morino, Akihiro Hori, Osamu Uchino, David W.T. Griffith, etc.

Contact: Isamu Morino and Voltaire A. Velazco

 

 

Burgos_Flyby.png

Weather

 An error occurred while retrieving the feed (no results returned).

 

The Burgos Wind Farm is located in the northernmost province of Luzon, Ilocos Norte (18.52°N, 120.65°E), which has been declared a "coal-free province". It is the second wind farm built in the province of Ilocos Norte and started operations in November 9, 2014. Upon its completion, it became the largest wind farm in the country and in Southeast Asia.

 

A paper on site assesment for the Philippines TCCON project and development of the TCCON FTS in Japan published in CDDJ.

 

Shipping Address:

(Updated Dec 2016)

To: Mr. Andy Durog

O & M Manager

EDC Burgos Wind Power Corp. (EBWPC)

Barangay Pagali 

Burgos, Ilocos Norte

2918 Philippines

Tel no: +63 (077) 755-2332 ext. 8011

 

Shipping and Unloading in December 21, 2017

 

The Installation Team from January 27, 2017

Install_team.jpg

Tag page

Files 1

FileSizeDateAttached by 
 BurgosContainer_inNIES (1).JPG
TCCON Container for Burgos at the NIES compound
3.88 MB23:22, 9 Mar 2017voltaireActions